The concrete business guide: concrete, masonry and paving jobs, pricing, contracts and cash, for US contractors

Concrete, masonry and paving share a crew yard and a hard deadline. Finding work, pricing each trade, writing the estimate and cash, with links to every article.

Updated 16 November 2026 · For builders, trades and home services

Working in Australia? See the Australian version: Concreting business guide.

A concrete crew is paid for a pour that happens on one day. Truck booked, forms checked, finishers on site, and no second chance if the mix goes off. Masonry is slower and cleaner and punishes a guess about what is behind the wall. Paving runs on machines and tons. All three are sold by the square foot and priced by the cost underneath it, and this page takes the four parts of the business in order and says where the three trades differ.

The search data covers concrete. The tracked concrete searches add up to about 93,400 a month at about $11.71 a click on average, with “concrete contractors” at about 60,500 searches, “concrete driveway” at about 18,100 and “concrete patio” at about 14,800 (Google Keyword Planner estimates via DataForSEO, November 2026). The figures ran from about 59,300 in November 2025 to about 123,300 in October 2026. We have no equivalent search data for masonry or paving.

Winning the work

Concrete companies tend to have two kinds of customer. Homeowners want a driveway, patio or walkway and compare estimates. Builders, remodelers and landscapers sub out the flatwork, and a builder who trusts you can fill the calendar. A short call to introduce your crew size, your availability and what you pour best is worth more than a month of ads. The steady income in this trade is builder work, and the best photo for the next homeowner is the last driveway on their street.

Qualify before you drive. Most inquiries cannot be priced by phone, because square footage, thickness, base prep, access and demolition decide the cost. Ask for a photo, a sketch of the area and whether there is old concrete to break out. As an example, if one click in 10 becomes an inquiry and one inquiry in three signs, you pay for about 30 clicks per job, around $345 at $11.52 a click. That works on a driveway and does not on a $400 repair, so set a minimum job size. Your Google Business Profile and reviews do the rest.

Masonry and paving buyers differ again. Masonry comes through builders, designers and homeowners with a chimney, a wall or a patio. Paving comes through owners of larger lots and roads, often on bid work. For how search demand compares by trade, see US homeowner search demand by trade.

  • Local Services Ads: With Local Services Ads you pay when a customer contacts you from the ad, not for a click. Here is how Google says it works, what counts as a lead and what to check before you start.
  • Speed to lead: A homeowner who asks for an estimate usually talks to the first contractor who answers. Here is what the research shows, a response standard you can set, and what to automate.

Pricing it

Start concrete from the yards. A cubic yard is 27 cubic feet, so a 20 by 24 foot patio at 4 inches thick is about 5.93 yards, and with 8 percent waste in the example you order 6.5. Then count what gets it in the ground and finished: base, mesh, forms, sealer, washout, saw cuts, equipment and labor at a loaded wage. The example’s direct cost is $3,385 and overhead and profit are taken as shares of the price.

Masonry is priced from your own production records. Unit price suits new walls and veneer, a fixed price suits patios and steps you can see, and time and materials suits repair and tuckpointing, where you cannot know the cost until you open the wall. Dust control belongs in the price, because OSHA’s silica standard applies to cutting block and brick.

Paving starts from the ground. Excavation, base stone and compaction cause most losses, because the surface looks the same while the ground under it does not. Asphalt is bought by the ton, so ask the plant, add hauling, rollers and pavers charged by the hour and traffic control where needed. A minimum job price covers mobilization, which costs about the same for a small driveway as for a large lot. Markup versus margin and job costing check the result.

  • Job costing: Track labor, materials, subs and overhead on every job, compare to your estimate, and use what you learn to price the next one.

Putting it in writing

A concrete estimate gets a row for each pour: area, thickness, strength, base, reinforcement, finish, joints, access for the truck or pump, curing and the days before vehicles. Add the line that causes arguments, which is what happens when rain or heat stops a pour and a truck is rebooked. State whether standby and cancellation fees pass to the customer. Add an 811 ticket and a rule that obstructions found underground are priced before work continues.

Exclusions matter most in this trade: landscape repair, tree roots, drainage work, fence or gate removal and color matching to old concrete, which never matches. Say how long before foot traffic and vehicles are allowed, and what the warranty does not cover, such as cracking from settlement. Control joints reduce cracking but cannot promise there will be none.

Masonry and paving paperwork add their own lines. A masonry contract names the bond pattern, mortar, cleaning and what happens with hidden conditions, and a paving contract states thickness, base, the area, drainage and a validity date because asphalt prices move. Written change orders cover added footage, and conditional lien waivers go with progress invoices. A general contractor who pays you as a sub may ask for one with each payment.

  • Change order template: A change order form you can copy, and the habits that get extras signed and paid.
  • Lien waivers explained: Four kinds of lien waiver, what each one gives away, and when a contractor should sign. State rules differ.

Running the business

Concrete cash is tight at both ends. You pay for ready-mix, base and labor before the owner pays, and the supplier’s invoice will not wait for a punch list. Take the deposit your state allows. Maryland, for one, allows no more than one-third of the contract price, and California caps it at $1,000 or 10 percent, whichever is less. Check yours.

Work out the jobs you need from your crew’s pour days. In the one-page example, a $30,000 monthly target at an average job of $5,000 means six jobs, and at three signed per 10 estimates that is 20 estimates. Then ask how many pour days one crew can deliver in a month once rain and curing are counted. If the answer is less than six, raise prices or add a crew before you buy more advertising. What a lead is worth to your business fills in the other half.

Hiring in this trade usually means finishers, laborers and sometimes a sub for pumping or saw cutting. Check license, insurance and workers’ compensation before the first day. Reply to each inquiry the same day, and follow up after the estimate, because a homeowner with three estimates often goes quiet. Our quote follow-up page shows how that chasing can be run for you.

  • Concrete business plan: Fill in your own numbers: what a job costs, how many you need each month, where the inquiries come from and when the cash arrives.

Common questions

How do concrete contractors price a job?

Work out the cubic yards, add base, forms, reinforcement, finishing, equipment and labor, then divide by what is left of each dollar after overhead and profit. Price per square foot is a figure to check afterward.

What differs between pricing concrete, masonry and paving?

Concrete is priced from yards and area, masonry from production rates and hidden conditions, and paving from tons, equipment hours and the base work under the surface. Masonry repair often needs time and materials, and paving small jobs need a minimum.

Do concrete companies need Local Services Ads?

Google’s category list does not show concrete as its own category as of November 2026, though it lists foundations, fencing and general contractor. Check which category your account allows before you build a budget around it.

What does OSHA say about cutting block and brick?

OSHA’s construction silica standard has employers either follow its Table 1 controls for tasks such as stationary masonry saws or measure exposure, with a written exposure control document, a competent person and training. Price the controls into the job.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy