Concrete business plan: a one-page worksheet

Fill in your own numbers: what a job costs, how many you need each month, where the inquiries come from and when the cash arrives.

Updated 24 November 2026 · For builders, trades and home services

Part of the concrete business guide.

A concrete business plan fits on one page: the work you pour, where you will drive, how you price a job, how many jobs a month you need, where the inquiries come from, what the crew and equipment cost, and how cash moves between a customer’s deposit and the supplier’s invoice. The Small Business Administration says a lean business plan can run to a single page. This is that page, with blanks for your own figures.

Figures marked “example only” show the arithmetic. They are not averages for concrete work.

Services and area

Decide what you pour and what you pass on. Flatwork is the base of many residential concrete companies: driveways, patios, walkways, garage floors and slabs. Stamped and decorative finishes, retaining walls, footings and foundations are separate skills with different risk.

  • Work you want: [ ]
  • Work you will pass on, such as foundations without an engineer’s drawing: [ ]
  • Smallest job worth a trip, because a mix truck delivery and a crew day cost the same on a small slab: [ ]
  • Counties or zip codes you will serve and the longest haul: [ ]

Pricing logic

Many concrete contractors price by the square foot, and that is fine as a starting point. Check each job against its costs before you quote it. Build the price from the lines below, then see what the square-foot figure comes out to.

Cost line What to include
Materials Concrete delivered, rebar or mesh, base material, forms, sealer, expansion joints
Labor Crew hours for prep, forming, placing, finishing and cleanup, with payroll costs
Equipment and delivery Pump or wheelbarrow work, saw, tools, truck and trailer, extra charges for short loads or difficult access
Permits and inspections Whatever your city or county requires
Overhead and profit Insurance, phone, software, your own pay, and the margin you set

Write down what you charge extra for: removal of old concrete, a steep lot, no truck access, weather delays. Read markup versus margin before you set the percentage, because adding 25 percent to cost does not give you a 25 percent margin. For the estimate itself, see how to quote a job.

Jobs you need each month

Line Your number Example only
Monthly revenue target [ ] $30,000
Average job price [ ] $5,000
Jobs to sign each month target divided by job price 6
Estimates that become jobs, out of 10 [ ] 3
Estimates to give each month jobs divided by win rate 20
Inquiries that become an estimate, out of 10 [ ] 5
Inquiries needed each month estimates divided by that share 40

The example is made up. Then check the diary: how many pour days can one crew deliver in a month, allowing for rain, curing and rework? If six jobs need more pour days than you have, the plan tells you to raise prices or add a crew before you buy more advertising.

Where inquiries come from

Concrete work is often searched for locally (“driveway replacement near me”), so a complete Google Business Profile with photos of finished pours is the first thing to fix. Add referrals from builders, landscapers and fencing contractors who need a slab poured, then past customers. Record the source of every inquiry. If you later buy ads or leads, customer acquisition cost shows what each signed job cost you to win.

Reply fast and follow up each estimate. A homeowner collecting three estimates often goes quiet. Following up after an estimate is usually the cheapest source of jobs you have, and PreBuild’s estimate follow-up does that step if you do not have time.

Crew and equipment

  • List what you own: tools, forms, vibrators, trowels, saws, trailer, truck. Add the replacement cost of each.
  • List what you rent per job, such as a pump or skid steer, and build it into the price.
  • Set a crew size for each job type. Write the labor hours per job from your last five jobs, not from memory.
  • Decide how you pay helpers. The IRS looks at behavior, finances and the type of relationship to decide whether a worker is an employee or an independent contractor. Ask your accountant.

Cash flow

Concrete jobs spend money early. You pay for the pour before the customer pays the balance, and a rain delay does not stop the crew’s wages. Write the order of cash for one typical job: deposit received, materials bought, wages paid, final payment due. The gap between the first outgoing and the last incoming is the cash you must have on hand per job, multiplied by the jobs open at once.

Deposit limits vary by state. In California, the Contractors State License Board advises that a down payment on a home improvement contract should not exceed 10 percent of the contract price, and later payments should not exceed the value of work done or materials delivered, per its December 2024 notice. Check your own state’s rule.

Licensing: check your state

Licensing for concrete work depends on the state and sometimes the job size. California, for example, has a C-8 concrete classification, and the CSLB describes it as forming, pouring, placing and finishing concrete work and setting screeds. Other states license differently or leave it to cities and counties. Check your state licensing board and your local building department before you sign anything. This is not legal advice.

Common questions

How do I start a concrete business?

Check licensing and insurance first, then set your prices from your own costs, buy only the tools your first jobs need and rent the rest. Keep records from day one.

How do I grow a concrete business?

Raise the average job size with decorative finishes and add-ons, track which sources produce signed jobs, and follow up every estimate before you add a second crew.

Should I price concrete by the square foot?

It is a useful check, but build each job from its costs first. Access, thickness, prep and removal change what a slab costs you from one job to the next.

What does a concrete company need in cash to start?

Enough to pay for materials and wages on every job open at once until the balance arrives. Work that out from your own job costs.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy

Pick 10, 15 or 20
No lock-in

Apply now