The solar business guide: winning installs, pricing per watt, contracts and cash, for US contractors

Winning solar proposals, pricing from your own cost per watt, writing the estimate and keeping cash moving, with links to every article on the topic.

Updated 16 November 2026 · For builders, trades and home services

Working in Australia? See the Australian version: Solar business guide.

Solar is a long sale. A homeowner compares proposals for weeks, the contract runs to five figures, and the money is made or lost in three places: the proposal that signs, the install that needs no second trip, and the cash that lands before the next crew mobilizes. This page covers the four parts of a US solar business and links to the full article on each.

Demand moves with policy, not only the weather. The IRS says the 30 percent Residential Clean Energy Credit does not apply to property placed in service after December 31, 2025. Across the four solar searches we tracked, monthly volume ran from about 65,000 in September 2026 to about 161,800 in March 2026 (Google Keyword Planner estimates via DataForSEO, November 2026). The data does not say why a month moved, so read your own booking history before you set a budget.

Winning the work

A solar inquiry rarely arrives ready to buy. The homeowner has usually asked two or three installers, wants to see savings against a real utility bill and is waiting to hear what the roof can carry. Win the first call by asking what they expect to pay and whether that figure assumed the tax credit. A buyer who counted on 30 percent back goes quiet when the net price appears. Hear it on the phone, before the site visit.

Clicks cost real money. “Solar panel installation” averages about $24.89 a click and “solar installers near me” about $28.49, and the four searches together average about $22.38 (same Google data). “Home battery backup” averages about $3.84, but that searcher is often an existing owner with different questions, so judge it as its own job. Google lists solar energy as a Local Services Ads category, and Local Services Ads for contractors explains what counts as a valid lead. Many solar leads start as a text message, so answer messages as fast as you answer the phone, as speed to lead sets out.

PreBuild Systems, which works in the United States, runs ads for solar installers, calls every homeowner who inquires, checks six things and sends each one to one installer only. The details are on our solar leads page.

  • How to get solar leads: Solar buyers compare proposals over weeks, and the end of the homeowner tax credit shifts the sums. Where solar leads come from, battery-only work, and what to check before you buy.
  • Local Services Ads: With Local Services Ads you pay when a customer contacts you from the ad, not for a click. Here is how Google says it works, what counts as a lead and what to check before you start.
  • Speed to lead: A homeowner who asks for an estimate usually talks to the first contractor who answers. Here is what the research shows, a response standard you can set, and what to automate.

Pricing it

Per watt is how a solar price is stated, not how it is built. Build it from the ground up: equipment priced from the distributor sheet on the day you quote, burdened install labor, design and site survey, permits and utility interconnection, a lender’s fee if one is charged to you, a warranty reserve and the cost of winning the customer. Installers leave that last line out most often, and solar proposals use sales hours whether they sign or not. What a customer costs you to win shows how to count it.

Then set overhead and profit as shares of the price. In the worked example, overhead is 12 percent and profit 10 percent, so direct cost is divided by 0.78 rather than multiplied by 1.22. In that made-up job, a 5 percent discount cuts the profit roughly in half. Decide before the first proposal who may discount, by how much and what the buyer gives back, such as a faster signature. The arithmetic is in markup versus margin, and job costing shows how to compare each finished install with the number you estimated. Do not anchor a price on an incentive that has ended. Show any state or utility program as its own line that names who it belongs to.

  • Job costing: Track labor, materials, subs and overhead on every job, compare to your estimate, and use what you learn to price the next one.

Putting it in writing

A solar estimate carries more than a price. It states system size in kilowatts DC, the panels, inverter and mounting, who files the building permit and the utility application, and that the system stays off until the utility approves it. Production and savings go in labeled as estimates, with the tool and the assumptions beside them. A homeowner who later finds the system produced less than a number you printed as fact is the dispute you want to avoid.

Write the exclusions in words a homeowner can follow: roof repair, tree trimming, a main panel upgrade, trenching. Each one that turns up on the day becomes a change order, so put the change order rule in the estimate too. A sale signed at the customer’s home falls under the FTC’s three-day cancellation rule where the sale is $25 or more, so leave the notice with the contract. Financing, leases and power purchase agreements carry their own disclosures, which this page does not cover.

Deposits are a state matter. California’s licensing board caps the down payment at $1,000 or 10 percent of the contract price, whichever is less, and says later payments cannot run ahead of the work performed, solar included. Check your own state. On progress payments, sign a conditional lien waiver when you invoice and an unconditional one only after the funds clear.

  • Change order template: A change order form you can copy, and the habits that get extras signed and paid.
  • Lien waivers explained: Four kinds of lien waiver, what each one gives away, and when a contractor should sign. State rules differ.

Running the business

Solar cash leaves early. Panels and inverters are bought before the install, a subcontracted electrician or roofer is paid when the work is done, and the lender or homeowner pays after inspection. Work out that gap on every job and keep a reserve for the weeks between a signed contract and the first payment.

Count your people carefully. Installers often mix employees, commissioned crew leads and subcontracted electricians, and the IRS looks at how the work is really done, not at the label. Employer payroll tax on wages is 6.2 percent for Social Security, up to a $184,500 wage base per employee for 2026, plus 1.45 percent for Medicare (IRS Publication 15). Put it in every labor line.

Track every proposal until it has an answer. Solar buyers need several follow-ups, and a list of who was sent what, and when, wins jobs that went quiet. Keeping track of inquiries and quotes and the follow-up email after a quote cover the habit. If a homeowner asks why you lost, ask them, because the answer is usually price, timing or a competing proposal.

Common questions

Is the federal solar tax credit still available for homeowners?

The IRS says the 30 percent Residential Clean Energy Credit covers qualified property installed from 2022 through December 31, 2025, and does not apply to property placed in service after that date. Check the IRS page, and your state and utility for other programs. Do not give tax advice to customers.

How do solar installers price a job?

Per watt of system size is how the price is stated. It is built from equipment, burdened labor, design, permits and interconnection, the cost of winning the customer, financing fees, a warranty reserve, overhead and profit.

Who files the utility application?

Write the answer on the estimate. Many installers file it for the customer, and the system stays off until the utility approves it.

Can I door-knock to sell solar?

Often, but read your city’s rules on soliciting first. The FTC Cooling-Off Rule gives the buyer three business days to cancel certain sales made at home, and your state may add more.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy

Pick 10, 15 or 20
No lock-in

Apply now