Painting estimate template: measurements, prep, coats and lead-safe work

A copyable painting estimate layout with measurements, prep steps, coats and the lead paint rule for older homes.

Updated 24 November 2026 · For builders, trades and home services

Part of the painting business guide.

Working in Australia? See the Australian version: Painting quote template.

A painting estimate template should price each room or surface by area, name the prep work and the number of coats, name the paint and sheen, and say what happens if the surface turns out worse than it looked. Copy the table below and replace the square brackets.

Painters lose money on prep and on vague scope. “Paint the house” is not a line. “Scrape, sand, prime bare wood and caulk, then two coats on the siding” is.

The painting estimate template

Section What goes in it Example wording
Header Business name, license number where your state requires one, insurance, EPA lead-safe certification number if you work on pre-1978 homes, phone, email, estimate number, date [Your business name], License [number], EPA RRP firm cert [number], Estimate [no.]
Customer and site Name, address, year built, occupied or vacant, access, parking, water and power available [Customer], [Address], built [year], occupied [Y/N]
Scope summary Interior, exterior or both; rooms or elevations included Interior: [rooms]. Exterior: [elevations], [trim], [doors]
Measurements Wall area, ceiling area, trim in linear feet, doors and windows by count, exterior wall area, number of stories [Sq ft] walls; [sq ft] ceilings; [linear ft] trim; [qty] doors
Surface condition What you saw: peeling, cracks, stains, bare wood, mildew, previous coating Peeling paint on [areas]; stains on [ceiling]; bare wood on [trim]
Preparation Washing, scraping, sanding, patching, caulking, priming, masking, furniture moving Wash, scrape loose paint, sand, patch, caulk, spot prime
Products Primer, paint, line, sheen, color, who supplies, number of coats [Brand / line], [sheen], [color name], primer [type], [number] coats
Walls and ceilings Per room: walls, ceilings, closets, accent walls, ceiling color [Room]: walls two coats; ceiling two coats
Trim, doors and cabinets Baseboard, casing, doors (both sides, edges), cabinets, spray or brush [Qty] doors, both sides; [linear ft] baseboard; semi-gloss
Exterior specifics Siding type, trim, eaves, soffit, fascia, decks, windows, shutters [Siding type]; trim [condition]; soffit [Y/N]
Lead-safe work For pre-1978 homes: certified renovator, pamphlet delivered, containment, cleaning verification Pre-1978: lead pamphlet delivered [date]; lead-safe practices on painted surfaces disturbed
Equipment Ladders, scaffolding, lift rental, pressure washer, sprayer [Lift rental] for [elevation]
Weather and schedule Start date, duration, weather delays, drying times, cure for decks Start [date]; about [days]; exterior work needs dry weather
Allowances Specialty finishes, wallpaper removal, wood repair above a set amount Wood repair allowance $[amount]; hourly above at $[rate]
Exclusions What is not in the price See exclusions below
Price Total, itemized by area, sales tax if it applies $[total]; tax: [included / on materials / check your state]
Payment Deposit, progress payment, final payment on walkthrough [Deposit] on signing; [amount] at midpoint; balance at walkthrough
Change orders Added areas, extra repairs, color changes after work starts Changes in writing, signed before the work starts
Warranty Workmanship period, what it covers, what it excludes Workmanship [period] against peeling from our work; excludes new damage and moisture
Validity and signature Date the price holds, signature lines Valid until [date]. Customer [signature, date]. Contractor [signature, date]

Download the painting estimate template as a Word document. Free, no sign-up. Fill in the parts in square brackets.

How to fill in each line

Measure the surface, then count the extras

For walls, multiply the room’s perimeter by the wall height and subtract large openings. Add ceilings by length times width. Measure trim in linear feet. Count doors and windows, and say whether both sides and edges are included. A room with high ceilings, stairs or a lot of trim takes more time than the square footage suggests, so price the difficulty, not only the area.

Prep is where the money goes

Write the prep on the estimate as steps: wash, scrape, sand, patch, caulk, prime, in that order. Say how much patching is included. If the walls need more than minor patching, add an allowance and an hourly rate above it. If you leave prep out, the customer assumes it is in, and the job turns into an argument at the end.

Paint and coats

Name the paint, the sheen and the number of coats, and say who supplies it. Coverage per gallon is printed on the can’s label, so take your gallons from that and your measured area, then add a margin for waste and touch-ups. A dark color over a light one, or a color change on a bare surface, may need extra coats or tinted primer. Say so if it applies.

Labor and markup

Price labor from your own production rates: the area you cover per hour for prep, brush, roll and spray work, on your crews. Add materials, equipment and any lift rental, then overhead and profit. Markup and margin are not the same number: a 25 percent markup gives a 20 percent margin. Use your own books for the real figures.

Lead paint on pre-1978 homes

This is the rule painters most often miss. The EPA’s lead renovation, repair and painting rule covers paid work that disturbs paint in housing built before 1978. It names painters, plumbers, carpenters and electricians. Firms must be EPA-certified, including sole proprietors, workers must be trained, and the lead pamphlet must go to the owner and occupants before work starts, with records kept for three years. Work that disturbs 6 square feet or less of paint per room inside, or 20 square feet or less outside, is exempt as minor repair, but window replacement is not. Source: EPA small entity compliance guide for the lead renovation rule.

Put the home’s year on the estimate, and if it is older than 1978, add the lead-safe line and the price of containment and cleanup. Painting over intact paint without disturbing it is different from sanding or scraping it. Check the rule and whether your state runs its own program.

Payment, license and cancellation rules

Other states differ, so check your own state’s licensing board. This is general information, not legal advice.

Exclusions to copy and edit

  • Moving heavy furniture, hanging pictures and removing window coverings, unless listed
  • Repairs to drywall, plaster, rot and substrate damage beyond the allowance
  • Wallpaper removal, popcorn ceiling removal and textured finishes unless listed
  • Lead, asbestos or mold found during preparation. Work stops until it is dealt with by a qualified person.
  • Areas not listed, including garage, closets, attic and basement
  • Color changes after the paint is ordered or applied
  • Rain, humidity or temperature delays on exterior work

Checking the estimate before you send it

  • Do the room measurements match your sketch, and did you subtract openings?
  • Is prep written as steps, with an allowance for extra patching?
  • Are paint, sheen, coats and who supplies it all on the page?
  • If the house is older than 1978, is the lead-safe line and its cost in?
  • Is the exterior start date clearly subject to weather?

After the estimate goes out

Call to say it is coming, then follow up the next day. Following up with leads when you are on the tools has the steps, and getting a yes in writing covers the signature. How to quote painting jobs goes deeper on pricing. PreBuild does not run painting leads in the US, so this page is a guide only. If you do remodeling, see remodeling leads.

Common questions

What should a painting estimate include?

The scope by room or surface, measurements, prep steps, paint name, sheen and coats, the lead-safe line for pre-1978 homes, exclusions, price, payment terms, change order terms, warranty and signature.

How do you estimate a painting job?

Measure wall, ceiling and trim areas, price prep and coats from your own production rates, add paint and equipment, then add overhead and profit.

Do painters need EPA certification?

In homes built before 1978, firms paid to disturb paint must be EPA-certified under the lead renovation rule, including sole proprietors, unless the work is minor repair.

What is the minor repair exemption?

The EPA exempts work that disturbs 6 square feet or less of paint per room inside, or 20 square feet or less outside. Window replacement is not exempt.

Should I charge sales tax on painting?

Check your state. Tax on labor and materials differs by state, so confirm with your state revenue department.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy

Pick 10, 15 or 20
No lock-in

Apply now