Part of the painting business guide.
Working in the United States? See the US version: Painting estimate template.
A painting quote template needs a line for every surface, a stated level of prep, the number of coats, the products, what access you have assumed and a short list of exclusions. Copy the table below into your own document and fill in the square brackets.
It is built for a job you have measured on site. If you are still working out the hours and the sequence, read how to quote painting jobs first. This page is the document you send once that work is done.
The painting quote template
Each row is a heading you can keep on the quote. Put your own wording in the third column.
| Section | What goes in it | Example wording |
|---|---|---|
| Header | Business, licence number where your state requires one, ABN, phone, email | [Your business name], [Licence no.], [ABN] |
| Client and site | Name, site address, date of visit, quote number | [Client name], [Address], [Date], [Quote no.] |
| Job summary | One sentence on what is being painted and why | Repaint interior of 3-bedroom house before sale |
| Surfaces: walls | Room, wall area or count, current surface, finish | [Room]: walls, [m2 or wall count], [existing paint / new plaster], [matt / low sheen] |
| Surfaces: ceilings | Room, area, finish, any cornice cut-in | [Room]: ceiling, [m2], [flat acrylic], cornice cut-in included Y/N |
| Surfaces: trim | Skirtings, architraves, doors (both sides?), windows, frames | [Number] doors, both faces and edges; [number] windows; skirting [lineal m] |
| Exterior | Walls, eaves, fascia, gutters, fences, decks, stage by stage | [Elevation]: [surface], [m2], [storeys], [scaffold / ladder] |
| Prep | Wash, scrape, fill, sand, spot-prime, caulk, mask, protect floors | Prep level: [light / standard / heavy], as described below |
| Coats and system | Primer or sealer, undercoat, number of finish coats, per surface | [Primer] + [2] finish coats on [surface] |
| Products | Brand and product line, or equivalent grade; who buys the paint; colours | [Brand / range], [colour names or codes], supplied by [you / client] |
| Access and site | Scaffold, lifts, occupied home, pets, working hours, power and water | Home occupied: Y/N. Access via [side gate / stairs] |
| Exclusions | What is not in the price | See exclusions list below |
| Price | Total, GST included or added, how it is split | $[total] including GST, split [by room / by stage] |
| Timing | Start window, expected days, weather rules for exterior work | Start [date window]; [number] working days; exterior work weather permitting |
| Payment | Deposit, stage payments, final payment trigger | [Deposit] on acceptance; [balance] on completion walk-through |
| Validity and acceptance | Date the price holds until, how to accept | Price valid until [date]. Accept by signing or replying ‘I accept quote [no.]’ |
Download the painting quote template as a Word document. Free, no sign-up. Fill in the parts in square brackets.
Keep the order. A homeowner reads from the top, finds their rooms and looks for the price. Everything between should help them see that you counted what they asked for.
How to fill in the surfaces
List by room, not by “interior”. A room-by-room list is easy to compare against another painter’s quote and hard to argue about later. Inside each room, give walls, ceiling, trim and doors their own lines, because they use different products and take different time.
Say which doors and windows are included, and whether both faces and the edges are painted. Say whether built-in wardrobes, cupboards and the inside of linen presses are in or out. These are the lines that get added on the last afternoon when nobody wrote them down.
For exterior work, record the storeys and how you reach them. A two-storey elevation with a garden bed under it prices differently from a single-storey wall you can reach with a ladder.
Prep, coats and products in the wording
Write the prep as actions, for example: “Wash walls, scrape loose paint, fill nail holes and cracks, sand, spot-prime stains, caulk gaps, mask floors and fittings.” The client sees what the money pays for. A quote that says “prepare and paint” tells them nothing and lets a cheaper quote look the same.
For coats, state the system per surface: “one coat sealer, two finish coats”. If new plaster or a big colour change needs a different system, say so on that line.
For products, name the brand and range or the grade you will use. If the client supplies the paint, add a line saying who is responsible if coverage is poor. If you change brand to suit supply, the quote should say you will tell the client first.
Exclusions to copy and edit
Keep only the ones that apply to the job.
- Moving heavy furniture, and removing and refitting light fittings, curtain tracks and blinds, unless listed
- Wallpaper removal and repair of the wall behind it
- Repair of structural cracks, rot, damp or water damage found once work starts
- Painting of surfaces not listed on this quote
- Work above [height] without scaffold or lift, unless listed
- Any material you suspect contains asbestos or lead paint: work stops until the client has had it tested and we have agreed what happens next
- Touch-ups after other trades have finished, unless booked and priced
The last two are worth keeping on any older home. If you do not know what is behind or under the surface, say that you have priced what you can see.
What regulators say a quote should show
No regulator publishes a painting quote form, but their pages on quotes agree on the content. The NSW Government says a written quotation should include all the work to be done and all the materials to be used, and that variations must be in writing and signed by both parties (NSW Government on getting quotes). Consumer Affairs Victoria tells tradespeople to say whether a quote includes travel, trips to collect materials, material costs, labour, call-out fees and weekend or public holiday rates, and to explain beforehand how changes, delays and late payments will be handled (Consumer Affairs Victoria on giving quotes).
Licensing and written contract thresholds for painting differ by state. Check your own regulator. This is general information, not legal advice.
Checking the price before you send it
Three checks catch most mistakes.
- Divide it back. Take the total and divide it by the wall and ceiling area, or by the days on site. Does the result look like the jobs you have finished? If it is well below, the prep has probably not been priced.
- Count the people-days. Add up the days each person will be on site and multiply by your real daily cost. Compare to the labour part of the price. Include set-up, masking, drying times between coats and clean-up.
- Put your quote beside the other one. Homeowners compare. Read the other quote if the client shares it and look for fewer coats, lighter prep or no masking. Do not criticise it. Show what yours includes.
As an example only, with made-up numbers: if two painters take four days on a house and your cost for each is the same per day, the labour is eight people-days. If the quote’s labour part is six, you are carrying the difference yourself.
Sending it and following up
Call before you send, say what is coming and when you will ring again. Painting is compared on price more than most trades, so a quiet quote is normal. The day after, ring to check they have what they need, then use the follow-up email after a quote steps. If it goes cold, reopening quiet quotes covers a second look a few weeks on. The general layout for any trade is in the quote template for builders and tradies.
If you want someone else to chase the quotes once they are out, PreBuild Systems does that on the quotes page. We do not currently list painting among our trades.
Common questions
What should a painting quote include?
The address and date, a room-by-room list of surfaces, the prep, the number of coats, the products, access assumptions, exclusions, the price, timing, payment stages and how long the price holds.
Should a painting quote include GST?
State clearly whether the price includes GST or has it added. If you are registered for GST, a client who is comparing quotes needs to see the same basis on each.
How long should a painting quote be valid?
The regulator pages we read do not set a period. Choose a date that fits how fast your paint and labour costs change, and write the date on the quote.
Should I quote painting by the square metre or by the room?
Use whichever you can defend with your own finished jobs. A room-by-room scope with the prep level written in is easier for a homeowner to compare.
Can I charge for giving a painting quote?
Some businesses do. If you charge, say so before you start, so the client agrees to the fee first.
