Good quote wording names the thing, the amount and the condition, and leaves nothing to be read two ways. Below is plain wording for the parts of a quote that cause the most trouble, each with the weak version and a clearer one. Copy the clear version, change the details and put your own voice in it.
These are examples, not legal text. Rules on deposits, contracts and variations differ by state, and each is flagged where it comes up. For the order of a whole quote, see how to quote a job.
Scope lines
A scope line says what you will do, where, with what. The weak version could mean three different jobs.
| Weak | Clear |
|---|---|
| Supply and install deck as discussed. | Supply and install a 4.8 m x 3.6 m deck at the rear of the house, [timber type and finish], on [footing type], with one set of stairs on the south side. |
| Bathroom renovation. | Strip the existing bathroom to the frame, waterproof the floor and walls, tile floor and walls to [height], and supply and fit the vanity, shower screen and toilet listed on page 2. |
| Paint the house. | Two coats of [paint brand and type] to the external walls, eaves and fascias, after washing and filling cracks up to [size]. Windows and doors are covered separately in item 4. |
Put the dimensions and materials in. If a number can change the price, it belongs on the page.
Exclusions
Exclusions are the lines that save you from a “but I thought” conversation. Be specific, and write each as something you will not do.
| Weak | Clear |
|---|---|
| Extras not included. | This price does not include council or certifier fees, removal of asbestos or contaminated soil, or repairs to existing structure found once work starts. If any of these turn up, we will stop, show you, and price the extra work in writing before we continue. |
| Excludes electrical. | Electrical work, including moving power points or lights, is not included. The homeowner is to arrange a licensed electrician before [date]. |
The Queensland building regulator tells homeowners to check that a quote discloses costs such as certifications, soil tests and dumping fees (QBCC, unpacking quotes, contracts and variations). If your price leaves any of those out, the exclusion line is where you say so.
Allowances for items not yet chosen
An allowance holds a place in the price for something the homeowner will choose later or you cannot cost yet. Say what it is, how much it is, and what happens if the final cost is different.
| Weak | Clear |
|---|---|
| Tiles allowed. | Allowance of $[amount] per square metre, supply only, for wall and floor tiles chosen by the homeowner by [date]. If the chosen tile costs more or less, the difference, plus GST, is added to or taken off the final claim. |
The terms and the rules around them are in provisional sums and prime cost items.
How long the price holds
| Weak | Clear |
|---|---|
| Price valid for a short time. | This price is held until [date]. After that date we will re-check material costs and our start dates before confirming. |
Western Australia’s consumer regulator notes that a quote may carry an expiry date after which it is no longer valid (Consumer Protection WA, estimates, quotes and deposits). A date is easier to read than “30 days”, because the homeowner does not have to count.
Payment terms
| Weak | Clear |
|---|---|
| Deposit required, balance on completion. | A deposit of $[amount] is due on acceptance. Stage payments: $[amount] when [stage, such as framing is complete], $[amount] when [stage]. The balance is due within [number] days of completion. Payments are by bank transfer to the details on the invoice. |
State the trigger for each payment, not just the amount. Deposit caps are set by state or country. Western Australia’s page says builders are not allowed to ask for more than 6.5 per cent on building contracts valued between $7,500 and $500,000, and New Zealand’s page says not to pay more than 10 per cent of the total price as a deposit (Consumer Protection NZ). Other states have their own limits, set out in building contract deposit limits by state. Check yours before you copy any percentage.
Changes and variations
| Weak | Clear |
|---|---|
| Changes will be charged extra. | Any change to the work in this quote is a variation. We will give you the variation in writing, with the change in price and any change to the finish date, before the changed work starts. Work on a variation starts once you have accepted it in writing. |
The NSW Government says all variations to a contract must be in writing and signed by both parties (NSW Government, getting quotes). Queensland’s regulator says a contractor must give the variation in writing, with the cost change, within five business days of the agreement or before work starts, whichever comes first. Both are good habits even where the rule does not apply to your job.
Assumptions and access
An assumption is something your price relies on. If it is wrong, the price moves.
| Weak | Clear |
|---|---|
| Subject to site conditions. | This price assumes the work area is clear of furniture and vehicles, the slab is level to within [tolerance], and we have access for [truck or machine] from [side]. If site access is different from this, the price will be reviewed. |
Accepting the quote
To accept this quote, sign and date below, or reply to this email with the words “I accept quote [number]”. On acceptance we will confirm your start date and send the deposit invoice.
Keep the sentence short, and give them one way to say yes. The signature lines and the same-day confirmation message are covered in quote acceptance.
All of this is general information, not legal advice. A solicitor or your state regulator can check your own wording.
Clear wording wins more jobs when someone also rings about the quote after it is sent. That second step is quote follow-up, and it is the part most trade businesses skip when they are busy.
Common questions
What should I write on a quote?
The job, the work, the materials, what is excluded, one price, how long it holds, payment stages, how changes are handled and how to accept. Each of these has a sample line above.
How do I word exclusions on a quote?
Write each as something you will not do, name the specific cost or work, and say what happens if it turns up. “Extras not included” leaves too much open.
Can I copy these lines into my own quote?
Yes, as a starting point. Change the details to your job, and have the final wording checked for your state and trade.
Where does a quote end and a contract begin?
Above a price threshold, which differs by state, your state may require a written contract in addition to the quote. Check your regulator’s page for the amount that applies to you.