How to write a quote a homeowner can say yes to

Scope first, price straight after, conditions in plain words. The order and wording of a quote, as the homeowner reads it.

Updated 15 November 2026 · For builders, trades and home services

Part of the guide for residential builders.

A quote a homeowner can say yes to has the scope at the top, the price straight after it, and the conditions in plain words underneath. Write it in that order, keep it to one or two pages, and read it as the homeowner would before you send it.

This article is about the writing. For how to work out the number, see how to quote a job. For a reusable set of fields, see the quote template.

Start with what the homeowner checks first

A homeowner opens your quote looking for three things. Is this the job I asked for? What does it cost? What happens next? Lay the top of the page out to answer them.

  • Your business name, licence number where your state requires one, phone and email.
  • The homeowner’s name, the site address, the date and a quote number.
  • One sentence that says what the job is.

That sentence matters more than it looks. Something like: “Remove the old timber fence and supply and install 22 metres of 1.8 metre steel fence along the east and rear boundary.” It shows you listened, and it gives them something to hold your later lines against.

Write the scope as things you will do

List the work as separate actions in the order they happen. Give measurements, materials and finishes where they change the price. “Supply and install as required” tells the homeowner nothing and tells you nothing when there is an argument later.

The NSW Government says a written quotation should include all the work to be done, list all the materials to be used and reflect the homeowner’s specifications (NSW Government, getting quotes). Write that for them on the page, so they do not have to ask.

A few habits help:

  • One action per line. “Excavate and pour footings” is two lines.
  • Name who supplies what. If the homeowner buys the tiles, say so.
  • Use the homeowner’s words for rooms and areas (“rear deck”, “main bathroom”) so they can find their own job.

Say what is not included

Exclusions belong on the quote, in a short list, under the scope. They stop the homeowner from assuming and stop you from absorbing.

Queensland’s building regulator tells homeowners that a low quote might come with hidden costs or exclusions, and to ask whether certifications, inspections and fees are covered (QBCC, seeking and comparing quotes). Homeowners are being told to look for this. Answer it before they ask.

Typical exclusions to think through for your trade: approvals and certification, removal of hidden problems found once work starts, repairs to existing work, painting or patching after your work, power and water connections, and anything the homeowner is supplying. Where you cannot know a cost until work starts, use a stated allowance and explain who carries the difference. The detail is in provisional sums and prime cost items.

Put the price in one place

Give one total, and say whether GST is included. Break it down only if the breakdown helps the homeowner compare. Too many small lines invite a haggle over each one.

Say what the price covers. Consumer Affairs Victoria tells tradespeople to make clear whether a quote includes transport, materials, labour, call-out fees, and weekend or public holiday rates (Consumer Affairs Victoria, giving quotes).

Also label what it is. A quote is a price you commit to. An estimate can move. If you charge a fee to prepare a quote, New Zealand’s consumer regulator says the business must tell the customer beforehand (Consumer Protection NZ, quotes and estimates). The difference between the two words is covered in quote vs estimate for builders.

Add validity, payment and changes

Three short lines under the price do a lot of work.

  • How long the price holds. A date, not “a few weeks”. Material costs and your calendar both move.
  • When you are paid. The deposit, if any, and each stage with its trigger. Deposit limits differ by state, so check building contract deposit limits by state.
  • How changes are handled. Consumer Affairs Victoria says to agree with the customer before you start how changes, delays and late payments will be dealt with. The NSW Government says variations to a contract must be in writing and signed by both parties.

Make acceptance easy and clear

End with one instruction: sign here, or reply with “accepted”. The reason to be careful is that a quote can bind you. Queensland’s regulator says that once a quote is accepted, in writing or even verbally, it becomes a legally binding contract (QBCC, unpacking quotes, contracts and variations). Victoria’s page says a contract exists whether the quote was verbal or written.

So do not send a quote you would regret being held to. Above a set price, your state may also require a written contract on top of the accepted quote. Queensland’s page gives $3,300 for that state. The thresholds for other states and the wording of an acceptance block are in quote acceptance. This is general information, not legal advice, so check your own regulator.

Read it as the homeowner before you send it

Give the quote a cold read. Look at the first page only and ask:

  1. Could a stranger tell what is being built?
  2. Is there a word they would have to ask you about?
  3. Can they see what is not included?
  4. Is the price easy to find, and does it say what it covers?
  5. Do they know what to do next?

Consumer Affairs Victoria advises homeowners to compare at least three written quotes for the same drawings (Consumer Affairs Victoria, getting quotes). Your quote will be set beside others, so make it easy to compare line by line.

Once it goes, chasing it is the next job. See follow-up email after a quote. PreBuild Systems also follows up quotes for builders and trades; the quotes page has the summary.

Common questions

What should be on a quote?

Your details, the homeowner and site, a one-line job summary, the scope, exclusions, one total with GST stated, how long the price holds, payment stages, how changes are handled and how to accept.

Does a quote have to be in writing?

Not always. Consumer Affairs Victoria says a quote can be verbal or written and a contract exists either way. A written quote gives both sides something to point to, so put it in writing.

How long should a quote be?

As long as the job needs and no longer. A small job fits one page. A large one needs the scope split by stage, but the price and next step should still be easy to find.

Should a quote list exclusions?

Yes. A short list of what the price does not cover prevents most disputes about scope.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy

Pick 10, 15 or 20
No lock-in

Apply now