A painting contract for a homeowner job should list every surface, the prep, the coats and products, who buys the paint, how payment works, how extras are handled, the warranty, and the lead-safe steps for homes built before 1978. Copy the table below, fill in the brackets and check your state’s rules. This is general information, not legal advice.
Homeowners compare painters on the same walls, which makes the contract the place to show what your price includes. Two painters can give the same number for very different amounts of work.
The painting contract template
| Section | What goes in it | Sample wording |
|---|---|---|
| Parties | Business name, license or registration number if your state requires one, phone; owner and job address | [Business name], license [number], [address] |
| Surfaces | Room by room or elevation by elevation: walls, ceilings, trim, doors, windows, cabinets, deck | [Room]: walls and ceiling; trim and [number] doors, both faces and edges |
| Prep | Work done before paint goes on: wash, scrape, sand, patch, caulk, prime, mask | Scrape loose paint, sand, fill nail holes and cracks, caulk gaps, spot-prime bare wood, mask floors and fixtures |
| Coats and products | Primer, number of finish coats, brand and line, sheen, colors | [Primer] and [2] coats of [brand and line], [sheen], color [name or code] |
| Paint supplied by | Who buys the paint, and who pays for extra | Contractor buys the paint. If Owner buys it, Contractor does not answer for how well it covers or lasts |
| Color approval | The date colors become final and the cost of a later change | Colors confirmed in writing by [date]; a change after work begins is a change order |
| Access and furniture | Who moves what, pets, occupied rooms, working hours | Owner clears small items; Contractor moves and covers large furniture |
| Pre-1978 homes | The lead-safe notice and work practices where they apply | Built before 1978: EPA lead pamphlet delivered [date]; lead-safe work practices apply |
| Price | One total and what it covers | $[total] for the work listed |
| Payment schedule | Deposit, any progress payment, final payment | $[deposit] at signing; $[balance] after the walk-through |
| Schedule and weather | Start window, working days, rule for outdoor weather | Exterior work stops for rain or for temperatures outside the paint maker’s range |
| Change orders | How extras are priced and approved | Added surfaces, repairs and color changes happen only through a signed change order |
| Warranty | Years, coverage, exclusions | [Number]-year warranty against peeling or blistering from application; excludes moisture damage, normal wear and owner-supplied paint |
| Cancellation | The federal notice and your state’s notice | See below |
| Signatures | Both parties, dated | Owner and date; Contractor and date |
Download the painting contract template as a Word document. Free, no sign-up. Fill in the parts in square brackets.
Surfaces, prep and coats
Write the scope the way the owner will check it when you finish. Room by room is the easiest to compare. For outside work, go by elevation and say how you will reach it: ladder, lift or scaffold.
List prep as actions (wash, scrape, sand, fill, caulk, spot-prime, mask) and coats surface by surface, such as one coat of primer and two finish coats. A line reading “prep and paint” is how the last afternoon turns into an argument over whether the inside of the closet was included.
The California Contractors State License Board gives owners a model. A good description reads “paint indoor entry using Brand X paint, color 567, two coats, with preparation and taping described in the next paragraph”, and a poor one reads “paint the entry” (California Contractors State License Board (CSLB) consumer guide, checked November 2026).
Paint supply and exclusions
Name who buys the paint. If the owner does, add that you are not responsible for coverage or durability of that product and say what happens when more is needed.
Exclusions to keep where they apply: wallpaper removal, rot, water damage or structural cracks found after work starts, work above a set height without a lift, heavy furniture, and touch-ups after other trades finish unless booked and priced.
Homes built before 1978
For a home built before 1978, the EPA’s lead rule may reach your job. The EPA says its renovation, repair and painting rule covers work that disturbs lead-based paint in homes, child care facilities and kindergartens built before 1978, that firms must be EPA- or state-certified, and that individual renovators must be trained by an EPA-accredited provider (EPA lead renovation, repair and painting program rules, checked November 2026). The page also explains what counts as disturbing paint, so check your jobs against it.
The rule adds paperwork. The firm must give the owner the EPA pamphlet no more than 60 days before the work, then either obtain a written acknowledgment or obtain a certificate of mailing at least 7 days before it starts. If the owner does not live in the unit, an adult occupant also gets the pamphlet. The acknowledgment can sit inside the contract (40 CFR 745.84, checked November 2026). Record the date you handed over the pamphlet in the contract and file the signed copy.
Payment and state limits
Painting jobs are short, so a deposit and a final payment is typical. Tie the final payment to a walk-through and a punch list. States set the rules on deposits and written contracts. California’s CSLB guide, for one, says a home improvement contract over $500 must be in writing, that a down payment cannot exceed $1,000 or 10 percent of the contract price, whichever is less, and that payments cannot exceed the value of the work done. Other states may use a different figure or none, so check yours.
Can the homeowner cancel?
Is there a federal right to cancel? Yes, in many sales. The FTC Cooling-Off Rule (16 CFR Part 429) covers a consumer service sold by someone who personally solicited it, when the buyer agrees away from the seller’s place of business and the price is $25 or more for a sale at the buyer’s residence. Signing at the kitchen table after your walk-through qualifies.
How long does the buyer have? Until midnight of the third business day. Sundays and federal holidays do not count as business days under the rule.
What must you hand over? At signing, two completed copies of the Notice of Cancellation form, a contract copy that states the right to cancel, and a spoken explanation. Never put a waiver of the right in the contract.
What if the buyer cancels? Refund every payment within 10 business days.
Does my state matter? Yes. The federal rule leaves state laws alone unless they are directly inconsistent: one that gives the buyer a smaller right to cancel, or charges a fee for canceling, loses. Your state licensing board can say what notice wording it expects.
Extras and change orders
Most painting disputes start with additions: a second room, the garage door, trim that was not on the list. Say that anything not listed is a change order, priced and signed before you paint it. Keep a short form ready with the surface, the extra cost, the date and both signatures.
Before you hand it over
- Every surface on the estimate appears in the scope.
- Prep and coats are written per surface.
- Paint supplier and color approval are stated.
- The year the home was built is on the job sheet, and the lead pamphlet is delivered where it applies.
- The cancellation notice and the state notices are attached.
For pricing the work behind the contract, read how to quote painting jobs. For wording that gets a yes in writing, see quote acceptance and quote wording examples.
PreBuild Systems follows up estimates on the quotes page. We do not list painting among the trades we run in the United States.
Common questions
What should a painting contract include?
The parties, a surface-by-surface scope, the prep, the number of coats, the products, who supplies the paint, the price, a payment schedule, a change order rule, the warranty, and any state or federal notices.
Do painters need a contract for small jobs?
A short written agreement with the surfaces, price and payment is wise on any job. Some states require a written contract above a dollar amount; California’s board says $500 for a home improvement contract.
Do I need lead-safe certification to paint a house?
If the home was built before 1978 and the work disturbs paint, the EPA rule may apply to you, and firms must be certified by the EPA or a state program. Check the EPA page for what counts.
Should I put the paint brand in the contract?
Yes. Name the brand and line or the grade, the sheen and the color, and say who buys it.
Can a homeowner cancel a painting contract?
Often. The FTC rule gives three business days to cancel a sale made at the buyer’s home, if it is $25 or more, and you must hand over the Notice of Cancellation form.