Part of the painting business guide.
To price a painting job, estimate the hours for prep, masking, priming and each coat, multiply by a loaded labor rate, add materials and your share of overhead, then divide by one minus the profit margin you want. Paint itself is the smallest line. Hours and overhead decide the result.
The numbers below are made up for the example. Use yours. This article is a pricing method for painters and for contractors who sub out painting. It is not legal or tax advice. For the sales side, read how to quote painting jobs.
How painters usually price
| Method | Works for | Watch for |
|---|---|---|
| Per room or per area | Interior repaints with similar rooms | High ceilings, dark colors and repairs change the hours |
| Per square foot of wall or siding | Whole-house work, large repeats | Prep level sits outside the number |
| Per linear foot | Fences, trim, baseboards | Condition of the surface |
| Flat price for the job | Most homeowner work | Scope creep without a written exclusion list |
| Hourly or time and materials | Repairs, odd jobs, unknown scope | Homeowners cannot compare it with a flat bid |
Every one of these is a way of presenting the same arithmetic. Work out cost first, then decide how to present it.
Cost the hours, not the paint
Break the job into steps and give each a time. Do it on paper before you quote, and keep the sheet so you can compare with the actual time later.
- Moving and covering furniture, floors and fixtures.
- Repairs: holes, cracks, caulk, scraping and sanding.
- Masking and taping.
- Priming, spot priming or stain blocking.
- Each coat, with cutting in separate from rolling on large surfaces.
- Touch-ups, cleanup and the walkthrough.
- Travel to the site and trips for supplies.
Prep is where estimates go wrong. Two rooms the same size can differ by a day. Write down which prep level you priced and what happens if the surface is worse than it looks.
Your loaded labor rate
A painter’s wage is not the labor cost. Add payroll taxes, workers’ compensation, any benefits and the paid hours that are not billable, like travel and supply runs. If a painter is paid for 2,000 hours and 1,600 are on a job, the loaded rate per billable hour is higher than the wage suggests. If you work on the tools yourself, put a wage on your own hours too, then keep the owner’s pay for running the business inside overhead.
Find your overhead
Overhead is what the business costs whether or not a room is being painted: insurance, license fees, the van, sprayers, ladders and scaffolding, software, advertising, and your time on estimates, including the ones that do not sign. Add up a year of overhead and divide it by the billable labor hours you actually expect to sell. That gives an overhead cost per labor hour, which you add to every job.
The SBA defines fixed costs as costs that do not change with how much you produce, such as salaries, rent and insurance, and treats things like fuel and repairs as partly fixed and partly variable (SBA page on calculating costs).
Markup versus margin
Markup is profit divided by cost. Margin is profit divided by price. If you want a 20 percent margin, divide cost by 0.80. That is a 25 percent markup. Adding 20 percent to cost gives only a 16.7 percent margin. The Journal of Light Construction also warns against averaging job margins to get a company figure: total gross profit divided by total sales is the correct figure (Journal of Light Construction, Margin Math 101). More detail in markup versus margin.
A worked example (made-up numbers)
An interior repaint of four rooms and a hallway, two painters. Every number is invented.
| Line | Amount |
|---|---|
| Labor, 64 hours at a $32 loaded rate | $2,048 |
| Paint, 9 gallons at $42 | $378 |
| Primer, 2 gallons at $36 | $72 |
| Tape, plastic, patch, caulk, sandpaper, roller covers | $160 |
| Direct cost | $2,658 |
| Overhead, 64 hours at $15 an hour | $960 |
| Total cost | $3,618 |
The $15 overhead rate comes from an invented $60,000 of yearly overhead divided by 4,000 billable hours. For a 20 percent margin, the price is $3,618 divided by 0.80, which is about $4,523. Profit is about $905. Round it to a price you would write on a quote, such as $4,525.
Compare the shortcut of materials times three. Materials here are $610, so that gives $1,830. The labor alone costs more.
Exteriors, lead paint and the weather
Exterior jobs add scaffolding or ladder time, pressure washing, scraping, caulking, weather days and a longer chance of rework. Price the weather days you expect to lose, or write a rain clause into the agreement.
For homes built before 1978, the EPA says anyone paid to do work that disturbs paint must be certified, including sole proprietorships, and must use lead-safe work practices (EPA Renovation, Repair and Painting program page). The extra containment, cleanup and training time goes in the price. Check the EPA page and your state for what applies to you.
Mistakes to avoid
- Pricing from a per square foot figure someone else posted. Check it against the hours on your last five jobs.
- Counting wages as the labor cost and skipping payroll taxes and workers’ compensation.
- Leaving out supply runs, travel, setup and cleanup time.
- Using markup and margin interchangeably.
- Giving a flat price without writing what is excluded: ceilings, closets, trim, repairs beyond a set amount, furniture moving.
- Never comparing estimated hours with actual hours after the job.
A written estimate also needs following up. See a painting quote template and follow-up after a quote. If you deal with homeowner calls and texts, answering every inquiry fast covers speed.
Common questions
How do you price a painting job?
Estimate hours for prep and each coat, multiply by your loaded labor rate, add materials and overhead, then divide by one minus your target margin.
Should painters charge by the hour, per room or per square foot?
Whichever comes out of your hours and costs. Flat or per room is easier for homeowners. Hourly suits repairs and unclear scopes.
What markup should a painter use?
The one your own budget produces: yearly overhead plus target profit divided by yearly direct costs.
Does lead paint change how I price?
For paid work that disturbs paint in homes built before 1978, the EPA requires a certified firm and lead-safe practices. Price the extra time in. Check the EPA page and your state.