A roofing estimate should name the roof, give measured quantities in squares and linear feet, price tear-off, decking repair, materials, flashing, permits and cleanup as separate lines, and end with a payment schedule, a warranty and a signature line. Copy the table below and replace each [bracket].
It is written for US residential re-roofs and repairs. Rules vary by state, so the licensing, deposit and tax lines say “check your state”. Nothing here is legal advice.
Roofing estimate template
| Section | What to write |
|---|---|
| Header | [Business name], [Address], [Phone], [Email], State license no. [number, where your state requires one], insurance carrier [name] |
| Estimate details | Estimate no. [number], date [date], valid until [date], prepared by [name] |
| Customer and site | [Customer name], [Property address], [Phone and email], year built [year], stories [number] |
| Roof description | Current covering [type], layers [number], deck [plywood / OSB / plank], pitch [rise]:12, access [easy / limited] |
| Measurements | Total area [number] squares (1 square = 100 sq ft), waste factor [percent], ridge [ft], hips [ft], valleys [ft], eaves [ft], rakes [ft], penetrations [number] |
| Safety and protection | Fall protection method [guardrails / harness anchors], protection of landscaping, siding and driveway [description] |
| Tear-off and disposal | Remove [number] layer(s) of [type]. Dumpster [size] included [yes / no]. Disposal $[amount] |
| Decking repair | Allowance [number] sheets / [number] linear ft at $[unit price]. Extra billed at $[unit price] after your approval |
| Underlayment and leak barrier | [Product], [where installed: eaves, valleys, full deck] |
| Roof covering | [Manufacturer, product line, color], [number] squares at $[price per square] |
| Flashing, drip edge, vents | [Chimney, wall, valley flashing], drip edge [ft], vents [number and type], pipe boots [number] |
| Ridge and hip cap | [Product], [ft] |
| Gutters and extras | [Gutter repair or replacement, skylights, solar removal and refit, or “not included”] |
| Permit and inspection | Permit [pulled by us / by owner], fee $[amount]. Sales tax: [check your state for whether it applies and how it is shown] |
| Exclusions | [Rotted framing, mold, asbestos or lead-containing materials, interior damage, electrical, structural repair, work not listed above] |
| Price | Option A [description] $[amount]. Option B [description] $[amount]. Total $[amount] |
| Payment schedule | Deposit $[amount] on signing [check your state’s limit]; $[amount] when materials are delivered; balance $[amount] on completion |
| Change orders | Work outside this estimate is priced and agreed in writing before it starts. Hidden damage found during tear-off is billed at the unit prices above |
| Timing and weather | Start [date or window], expected duration [days]. Dates move for weather. Temporary cover [yes / no] |
| Warranty | Workmanship [number] years, covering [what it covers]. Manufacturer warranty [terms], registered by [us / owner] |
| Acceptance | Signed [customer], date [date]; signed [contractor], date [date] |
Download the roofing estimate template as a Word document. Free, no sign-up. Fill in the parts in square brackets.
How to fill in each line
Measurements
Measure the roof surface, not the floor plan. A pitched roof is bigger than the footprint under it. If you measure from the ground or from an aerial report, say so on the estimate and check it on the roof. Add a waste factor for cuts and starter courses, and show it as its own number so a customer sees where extra shingles go. The factor depends on roof shape, so use your own records.
Tear-off, disposal and decking
You cannot see the deck until the old roof is off. Do not guess. Write an allowance for a set number of sheets, and a unit price for each extra sheet or linear foot of board. The base price stays fixed, and the price of any surprise is agreed before anyone finds it.
Safety
OSHA says workers six feet or more above lower levels are at risk of serious injury, and that on roofing jobs you should think through every fall hazard and choose protection that suits the work (OSHA fall protection). Anchors, guardrails or lifts cost money. Put them on the estimate or in your cost, not nowhere.
Materials and flashing
Name the manufacturer, product line and color, so the homeowner knows what is going on the roof. Flashing is where leaks start. List what you replace, such as chimney, wall, valley and pipe flashing, and do not hide it under “misc.”
Pre-1978 houses
If the work disturbs painted surfaces on a house built before 1978, for example replacing painted fascia or trim, EPA’s Renovation, Repair and Painting rule says anyone paid to do that work must be a certified firm using lead-safe work practices (EPA RRP program). Check the page for your job, and price the extra work.
Deposits, contracts and tax: check your state
Each state sets its own rules, and so does each licensing board. As one example, California’s contractors board says a written home improvement contract is required over $500 in labor and materials, that changes must be in writing, and that a down payment should never exceed 10 percent of the contract price or $1,000, whichever is less (California Contractors State License Board). Your state may be different. Look up your state’s contractor licensing board before you set a deposit. Whether sales tax applies to roofing work also varies by state. Ask your accountant.
Payment schedule and change orders
Tie each payment to something that happens: signing, delivery, completion. Say how a change is handled and that it is signed before the work. Our article on getting a yes in writing covers acceptance, and our guide to provisional sums and prime cost items explains allowances like the decking line, in Australian terms.
Warranty, validity and signature
Separate your workmanship warranty from the manufacturer’s. State the number of years and what it covers. Set a valid-until date, because material prices change. Add a signature line for both parties. If you want a signed estimate to work as the contract, say so on it and have your attorney check the wording for your state.
After you send it
Many estimates are not accepted the first time. Follow up with something specific. Our guide to a follow-up email after a quote has wording, and the page on quote follow-up explains how that can run without you chasing by hand.
Common questions
What should a roofing estimate include?
The roof description, measured squares and linear feet, tear-off and disposal, decking allowance, materials, flashing, permits, exclusions, price, payment schedule, change order wording, warranty and signatures.
How do I estimate squares on a roof?
Measure the roof surface area in square feet and divide by 100. Add waste for cuts and starter material. Say how you measured.
Should the estimate include sales tax?
That depends on your state. Check your state tax agency or ask your accountant, then show tax the way the rule requires.
How much deposit can I ask for?
Some states set a cap and some do not. Check your state’s licensing board before setting it.
Is a roofing estimate a contract?
Not automatically. If you want signing to form the contract, say so on the document and have an attorney check it for your state.