Plumbing quote template: fixed-price and hourly items, parts and paperwork

A copyable plumbing quote layout that separates fixed-price from hourly items and names the compliance paperwork and exclusions.

Updated 21 November 2026 · For builders, trades and home services

Part of the plumbing business guide.

Working in the United States? See the US version: Plumbing estimate template.

A plumbing quote template needs two kinds of price in it, fixed and hourly, a call-out line, the fixtures and parts and who supplies them, the compliance paperwork for your state and a list of what you have left out. Copy the table below and replace the square brackets.

Plumbing quotes go wrong when the hidden part of the job turns out to be bigger than the visible part. The layout below is built to keep that risk in the open and shared with the client. For the sequence to follow before you write one, see how to quote a job.

The plumbing quote template

Section What goes in it Example wording
Header Business name, plumbing licence number, ABN, phone, email [Your business name], [Licence no.], [ABN]
Client and site Name, address, date of visit, quote number, whether owner or tenant [Client name], [Address], [Date], [Quote no.]
Job summary What is wrong or what is being built, in a line or two Replace hot water system and relocate to side of house
Call-out and travel Call-out fee, travel, after-hours or weekend rates, minimum charge Call-out $[x]; after hours $[x]/hr; minimum [x] hr
Fixed-price items Work you can see and count: fixture swaps, hot water replacement, a defined pipe run [Item], supply and install, $[price]
Hourly items Work you cannot see yet: leaks behind walls, blocked drains, old pipework [Task], $[rate]/hr, not to exceed [x] hr without your approval
Fixtures and appliances Tapware, toilets, basins, hot water units: brand and model, or allowance, and who buys Client supplies / We supply: [brand, model] or allowance $[amount]
Pipework and fittings Pipe material and size, fittings, valves, pressure or temperature control [Material], [size], [lineal m], isolation valves [qty]
Drainage Drain lengths, connection to existing, inspection openings, camera inspection [m] of [size] drain, connect to [point], camera before and after Y/N
Excavation and access Digging, concrete cutting, roof or ceiling access, working under floors Excavate [m], reinstate [soil / concrete]; access via [hatch]
Parts and materials Parts at cost plus margin, or itemised, and what happens to small items Parts itemised below / Parts at [cost + x per cent]
Compliance paperwork Notice of work, compliance certificate, diagrams, permits, inspection fees [Documents] provided to [client / regulator] on completion
Disposal Old fixtures, hot water units, spoil Old unit removed Y/N; spoil removed Y/N
Exclusions What is not in the price See exclusions list below
Price Total fixed items, estimated hourly items with cap, GST Fixed $[x] + estimated hourly $[x] = $[total] including GST
Timing, payment, validity Start window, how long without water, deposit, final payment, date the price holds Water off [hours]; valid until [date]; balance on completion

Download the plumbing quote template as a Word document. Free, no sign-up. Fill in the parts in square brackets.

Fixed-price items and hourly items

Split the quote into two blocks so the client can see which is which.

  • Fixed price for work you can see and count: replacing a hot water system like for like, swapping a toilet, fitting a new tap, running a defined length of pipe with clear access.
  • Hourly, with a cap for work you cannot see yet: tracing a leak, clearing a drain of unknown cause, replacing old pipework behind a finished wall. Give the rate, a rough number of hours and a line like ‘we will call you before going past [x] hours’.

That second line is what makes an hourly item acceptable to a client. It keeps control with them. It also stops the invoice from being the first time they hear the number has moved.

Consumer Affairs Victoria tells tradespeople to say whether a quote includes travel, trips to collect materials, material costs, labour, call-out fees and weekend or public holiday rates, and to explain beforehand how changes and delays will be handled (Consumer Affairs Victoria on giving quotes). The NSW Government says variations must be in writing and signed by both parties (NSW Government on getting quotes). A plumber’s quote that shows the call-out, the after-hours rate and the hour cap already does that.

Fixtures, parts and who supplies what

Write the model of anything that sets the price: toilet suite, tapware, hot water unit. If the client has not chosen yet, put in an allowance and say what happens if the final choice costs more or less. The wording for allowances is in provisional sums and prime cost items.

If the client supplies the fixture, add a line: “Client-supplied fixtures are installed as delivered. We are not responsible for defects in the fixture itself.” Add what happens if the fixture arrives damaged or the wrong size and you have to come back.

Access, excavation and what you cannot see

Access is where plumbing prices move. Write down how you will reach the work, for example “through the roof hatch”, “under the house” or “break out the slab, [m] by [m]”, and who reinstates it. If digging is needed, state the length, depth and what it is reinstated with. Say who pays for concrete cutting, tile removal or wall opening, and who repairs it afterwards.

Add one assumption line about condition: “Price assumes existing pipework and connections are sound. Additional repairs found once work starts will be quoted before we continue.”

Compliance paperwork by state

The documents you must provide, and when, are set by your state. Here is what two regulator pages say, read on 15 November 2026:

State What the regulator’s page says
New South Wales A Notice of Work goes in before starting (emergency work and minor work such as replacing tapware or existing hot water systems are exceptions). A Certificate of Compliance goes to the person who arranged the work when all the plumbing and drainage work is complete, and a Sewer Service Diagram at the completion of drainage work.
Queensland For notifiable work, Form 4/4A is lodged within 10 business days after the work is finished and a copy goes to the owner or occupier, or the person who requested the work. Some work that looks notifiable is permit work instead. In-ground sanitary drainage on a detached house needs an as-constructed diagram attached.

Sources: NSW Government on plumbing inspection documents and QBCC on notifiable work. Other states are not covered here; check your own regulator. This is general information, not legal advice.

Put a line on the quote: “Includes [Notice of Work / Certificate of Compliance / Form 4], provided on completion.” It shows the client the paperwork is priced in.

Exclusions to copy and edit

  • Tiling, plastering, painting and carpentry after plumbing work, unless listed
  • Concrete cutting and reinstatement, unless listed
  • Electrical work, including connecting new hot water units that need a new circuit
  • Council, authority and permit fees, unless listed
  • Repairs to existing pipework, fixtures or drains found defective once opened up
  • Work on gas or on equipment that needs a separate licence, unless you hold it and have listed it
  • Water outages beyond [hours]

Checking the price before you send it

  • Add the fixed items and the hourly estimates separately, then together. If the hourly estimates are more than the fixed items, the quote is a guess with a fixed-price cover.
  • Check each call-out, return visit and inspection for time and travel.
  • Check parts against a supplier price list, not last year’s invoice.
  • Read the exclusions from the client’s side: would any of them surprise a person who has never had this job done before?

Once it is out, follow up the next day using the follow-up email after a quote. If you want help with enquiries, plumbing marketing covers where plumbing work comes from. PreBuild Systems does not currently list plumbing among its trades, but the quotes page shows how quotes are followed up.

Common questions

What should a plumbing quote include?

Your licence number, the site, a fixed-price block, an hourly block with a cap, call-out and after-hours rates, fixtures and who supplies them, compliance paperwork, exclusions, the price and how long it holds.

Should I quote plumbing work fixed price or hourly?

Fixed price for work you can see and count. Hourly with a stated cap for work you cannot see, such as leaks behind walls, and say on the quote which items are which.

Do plumbers have to give a compliance certificate?

In New South Wales and Queensland the regulators’ pages above describe documents a plumber must provide, with their own timing. Check your own state’s regulator.

How do I charge a call-out fee on a quote?

Show it as its own line, with the after-hours and weekend rates beside it, and say whether it is deducted from the job if the client goes ahead.

What if I find a bigger problem after starting?

Stop, show the client, give a price for the extra and get a yes in writing before you continue. Put that wording on the quote so it is agreed in advance.

Want homeowners for your business?

Tell us your trade and where you work. We'll ring you to talk it through and give you your price in writing. If it's not a fit, we'll say so.

No retainer, no lock-in, nothing monthly.

We'll ring or text you about your application. No spam. Privacy

Pick 10, 15 or 20
No lock-in

Apply now