Part of the landscaping and pool business guide.
Working in the United States? See the US version: Landscaping estimate template.
A landscaping quote template should break the job into zones, give every material as a quantity, name each plant and say what happens to the soil you dig out. Copy the table below, rename the zones for the job and replace the square brackets.
Landscaping is quoted by the zone and by the quantity because the client wants to see where the money goes and because materials are bought by volume and area. The general layout is in the quote template for builders and tradies. This one is built for gardens, paving, walls and planting.
The landscaping quote template
| Section | What goes in it | Example wording |
|---|---|---|
| Header | Business, licence or registration where your state requires it, ABN, phone, email | [Your business name], [Licence no.], [ABN] |
| Client and site | Name, address, date of visit, quote number, a sketch or drawing reference | [Client name], [Address], [Date], [Quote no.], [Drawing ref.] |
| Zones | Name each zone so every line below belongs to one | Zone A: front garden. Zone B: rear entertaining area. Zone C: side access |
| Site preparation | Demolition, clearing, levels, stripping turf, protecting what stays | [Zone]: strip [m2] turf, remove [item], protect [tree / path] |
| Earthworks and spoil | Excavation depth, cut and fill, spoil removed or kept on site, truck access | [Zone]: excavate to [mm], [m3] spoil removed by [us / client] |
| Hard surfaces | Paving, concrete, decking, edging, steps: material, area, base depth, pattern | [Zone]: [material, size], [m2], [mm] compacted base, [pattern] |
| Walls and structures | Retaining walls, garden walls, pergolas, fences: height, material, drainage, engineering | [Zone]: [m] long, [mm] high, [material], drained, engineer required Y/N |
| Soil and mulch | Soil mix supplied, depth, mulch type and depth, by volume | [m3] [soil type], [mm] deep; [m3] [mulch], [mm] deep |
| Turf | Type, area, preparation, first mow | [Variety], [m2], levelled and rolled, first water by [us / client] |
| Plants | Species or size grade, pot size, quantity, spacing, supply by whom | [Species], [pot size], [qty], spacing [mm] |
| Irrigation and lighting | Zones, controller, drip or spray, power or tap connection, who does licensed work | [Number] zones, [controller], [drip / spray]; connection by [licensed trade] |
| Drainage | Stormwater, agricultural drains, pits, discharge point | [m] of [size] drain, [qty] pits, discharge to [point] |
| Site access | Machine access, barrowing distance, gate widths, storage, working hours | Access via [side / front]; barrow distance [m]; materials stored at [location] |
| Approvals | Council, strata, engineer: who applies and who pays | Client / We apply; fee $[x] [included / excluded] |
| Exclusions | What is not in the price | See exclusions list below |
| Price | Total, by zone, GST included or added | Zone A $[x]; Zone B $[x]; Zone C $[x]; total $[x] including GST |
| Timing, payment, validity | Start window, weather days, stage payments, date the price holds | Start [window]; stages [list]; valid until [date] |
| Maintenance and establishment | What you do after practical completion and what the client does | [Number] visits over [period]; client waters per care sheet |
Download the landscaping quote template as a Word document. Free, no sign-up. Fill in the parts in square brackets.
Zones and quantities
Start with a sketch or a measured drawing and mark each zone with a letter. Every line on the quote belongs to a zone, so the client can say “drop Zone C for now” and you can re-price in a minute. It also lets you stage the work if the budget does not stretch to all of it.
Give materials as quantities: square metres of paving, cubic metres of soil and mulch, lineal metres of edging and walling, the number of plants. A line that says “paving, supply and lay” with no area is a guess. Add waste where it applies, such as cut pavers, and say whether it is in the quantity or the rate.
Plants, soil and irrigation
Plants are the line clients argue about, because the price range is wide. Name the species or the size grade, the pot size and the quantity. If you substitute when stock is not available, say so on the quote: “Substitutes of equal size and similar habit will be used if listed species are unavailable, with the client told first.”
Say which soil you are supplying and how deep it goes. For turf, say what the preparation is. For irrigation, list the zones, the controller and the type. Connection to power or to the mains water supply may need a licensed trade. Name who does it and whether it is in your price.
Soil, spoil and rock
Spoil is the cost most often left off. QBCC tells homeowners to confirm who removes excess soil from the site, because it can be an expensive extra (QBCC on comparing quotes). Put it on the quote with the volume you assumed. For example: “Price allows removal of [m3] of spoil. Additional spoil removed at $[rate] per cubic metre.”
Below the surface is the other unknown. The NSW Government gives the example of rock beneath the surface needing extra equipment and labour, and says all variations must be in writing and signed by both parties (NSW Government on getting quotes). Write a line for it: “Price assumes no rock, services or buried waste. If found, work stops and we agree the extra in writing.” Keep photographs of the site, with dates, to show what you saw before you started.
Walls, drainage and approvals
Retaining walls, tall fences, pergolas and drainage can need approval or an engineer. Whether they do depends on your state, the council, and the height and position of the structure. Check with the council and write on the quote who applies, who pays and what happens if approval changes the design.
For walls, state the height, length, material, footing, drainage behind the wall and the backfill. Drainage behind a retaining wall is easy to cut from a competing quote because the client cannot see it afterwards.
Access, weather and maintenance
Machines need a way in. If everything has to be barrowed through the side gate, that is extra labour, and it goes on the quote with the distance. If the client’s car, boat or trailer is in the way, say who moves it.
Weather moves landscaping dates. Put it in the timing line: “Dates are estimates and move with weather. Wet days on earthworks and concrete are not counted against the finish date.”
Maintenance and establishment need a line of their own: whether you water, what the client waters, how long you will replace plants that fail and what voids it, such as no watering. Write the period you are prepared to honour. The ACCC says the basic consumer guarantees for services, such as due care and skill, cannot be taken away by anything a business says or does, and that a warranty is a separate extra promise (ACCC on consumer guarantees). Your maintenance period is that extra promise. Write it so it adds to the client’s rights and does not claim to replace them.
Exclusions to copy and edit
- Council and authority fees, engineering and surveys, unless listed
- Removal of rock, asbestos, contaminated soil or buried services found once work starts
- Repairs to existing fences, paths, pools, pipes and cables damaged by pre-existing faults
- Plants lost after handover from lack of watering, frost or pets
- Electrical and gas connections by other trades
- Furniture, pots, sculptures and feature items unless listed
- Work in zones not listed on this quote
Checking the price before you send it
- Add the zones. Does each zone look right beside similar jobs you have done?
- Check the biggest quantity lines against the sketch again. Most errors are an area read wrong.
- Check hire, delivery and cartage, tip fees and your own access cost. Include setup and removal of machines.
- Check that spoil, rock and approvals each have a line, even if the line says ‘not included’.
Once the quote is sent, ring the next day and use the follow-up email after a quote steps. For where landscaping jobs come from, see landscaping marketing and landscaping and pool leads. PreBuild Systems finds homeowners for landscaping and pool businesses and follows up quotes on the quotes page.
Common questions
What should a landscaping quote include?
Zones, quantities of every material, named plants with pot size, soil and mulch depth, irrigation, spoil removal, access, approvals, exclusions, price, timing, payment and a maintenance period.
Should a landscaping quote be a quote or an estimate?
Give a quote when you have measured and can see the site. Call it an estimate when the ground or the design is not settled, and say what could move the price.
Who pays for soil removal in a landscaping job?
Whoever the quote says. It is often left off, so put the volume you assumed and the rate for extra on the quote.
How long should a landscaping quote be valid?
The regulator pages we read do not set a period. Material and plant prices move, so set a date and write it on the quote.
How do I handle plants that die?
State the period you will replace plants, what the client must do, such as watering, and what is not covered, such as frost or damage. Keep it separate from the client’s consumer guarantees.