Part of the electrical business guide.
An electrical quote template should price the job by circuit or by point, name the switchboard work, say which compliance certificate you will issue and list what you are leaving for other trades. Copy the table below and replace the square brackets.
The general layout for any trade is in the quote template for builders and tradies. This page is for electricians, so it goes into what that general one cannot: circuits, boards, certificates and patching.
The electrical quote template
| Section | What goes in it | Example wording |
|---|---|---|
| Header | Business name, electrical contractor licence number, ABN, phone, email | [Your business name], [Contractor licence no.], [ABN] |
| Client and site | Name, address, date of site visit, quote number, who is the account holder | [Client name], [Address], [Date], [Quote no.] |
| Job summary | What is being done and why, in one or two lines | Rewire kitchen and add 4 circuits for renovation |
| Existing supply | Phase (single or three), main switch rating, board type and condition, meter position | Single phase, [rating] A, [board type], [notes] |
| Switchboard | New board or additions, number of circuits, safety switches (RCDs), labelling, location | Supply and fit [make] board, [number] circuits, safety switches on [circuits] |
| Power points | Quantity, type (single or double, USB), location, new circuit or existing | [Qty] double power points, [rooms], on [new / existing] circuit |
| Lighting | Quantity, type (downlights, pendants, batten), brand or grade, switching, dimmers | [Qty] LED downlights, [colour temp], [dimmable Y/N], [brand] |
| Dedicated circuits | Oven, cooktop, air conditioner, hot water, EV charger, pool, with cable size and breaker | [Appliance], [circuit rating] A, cable run [m] |
| Smoke alarms and data | Alarms supplied and wired, data points, TV points | [Qty] interconnected alarms, [qty] data points |
| Cable runs and access | Roof space, under floor, wall chasing, trenching, conduit, storeys | Cable via [roof / subfloor]; chasing [Y/N]; trench [m] |
| Fixtures supplied by client | Who buys lights, fans, appliances; delivery date; what happens if they arrive late | Client supplies [items]; we fit only |
| Allowances | Items not yet chosen, with the amount held and what happens above or below it | Light fittings allowance $[amount] supplied, [qty] fittings |
| Compliance and testing | Testing, the certificate for your state, inspections, network provider paperwork | Test and certificate [name] issued on completion |
| Exclusions | What is not in the price | See exclusions list below |
| Price | Total, GST included or added, split by stage if the job is over [x] days | $[total] including GST |
| Timing | Rough-in and fit-off dates, power-off periods the client should prepare for | Rough-in [window]; fit-off after plaster and paint; power off [hours] |
| Payment and validity | Deposit, stages, final payment, date the price holds until | Valid until [date]; [deposit] on acceptance; balance on completion |
Download the electrical quote template as a Word document. Free, no sign-up. Fill in the parts in square brackets.
Not every row applies to every job. A power point and a light swap needs about half of these. A rewire needs all of them and a staged price.
Scope by circuit or by point
Write the scope as items the client can count. “Install 6 double power points” is a line. “Power upgrades” is not. If the work is new circuits, list each circuit with what it feeds and the breaker size, so the client can tell what they are paying for when they see the board.
Say what the existing supply is and what you are assuming about it. Many surprises on electrical jobs come from the old board, old cable or a main switch that cannot carry the new load. If you have not seen inside the board, write “price assumes the existing board and cabling are in serviceable condition. Any defect found will be quoted separately before we continue.”
Keep a separate line for who supplies fixtures. When the client buys lights and fans, the quote should say they must be on site by a date and what extra visit charge applies if they are not. When you supply, name the brand or grade, because “downlights” can mean a very wide price range.
Compliance certificate and testing
Put the certificate on the quote, by name. It shows the client the price includes testing and paperwork, and not only fitting. The names and timing differ by state. Here is what three regulator pages say, read on 15 November 2026:
| State | Certificate and timing, per the regulator’s page |
|---|---|
| New South Wales | Certificate of Compliance for Electrical Work (CCEW), submitted through the BCNSW eCert portal as soon as practical and no later than seven days after the electrical test is completed. Copies can go to the customer. |
| Victoria | Certificate of Electrical Safety (COES). For prescribed work the electrician must give the customer a copy within 4 days of completing the certificate once inspection is complete. For non-prescribed work, within 30 days. |
| Queensland | A certificate of testing and safety (work on electrical equipment) or a certificate of testing and compliance (installation work), given to the person the work was done for as soon as possible after testing or completion. Keep a copy for 5 years. |
Sources: NSW Government on electrical compliance, Energy Safe Victoria, Business Queensland.
Energy Safe Victoria also says an electrician cannot refuse to issue a COES for any reason, including payment issues or contract disputes. Other states are not covered here; check your own regulator. This is general information, not legal advice.
Exclusions to copy and edit
- Patching, plastering, painting and tiling after chasing or cutting. State who does it.
- Cutting or patching brick, concrete or roof tiles, unless listed
- Network provider fees, new connections, meter changes and pole or service work, unless listed
- Asbestos found in walls, ceilings, boards or meter panels. Work stops until it has been dealt with by someone licensed.
- Upgrades needed to bring existing, unrelated wiring up to the current standard, unless found and agreed in writing
- Supply of client-chosen fixtures, appliances and air conditioners
- Work outside [hours] or on public holidays, unless priced
Patching is the line that causes the most argument, because the electrician thinks of it as finishing and the client thinks of it as part of “the electrics”. Write who does it.
Fixed price or hourly
Quote a fixed price when you can see all of the job: a defined number of points, a board change, a new circuit with an accessible run. Quote hourly, with a cap you will not go past without telling the client, when you cannot see inside: fault finding, old homes with unknown cabling, work behind finished walls. Say on the quote which parts are which.
The NSW Government says all variations to a contract must be in writing and signed by both parties (NSW Government on getting quotes). Consumer Affairs Victoria tells tradespeople to say whether a quote includes travel, materials, labour, call-out fees and weekend or public holiday rates (Consumer Affairs Victoria on giving quotes). Put your call-out and after-hours rates on the quote so there is no argument at invoice time.
Checking the price before you send it
- Count the points and circuits on the quote against your site notes and photos. Count again from the cable runs: does the length you priced reach every room?
- Check the labour against stages: rough-in, board, fit-off, testing and return visits. Many quotes miss the second and third visit.
- Check that testing, the certificate and any inspection or network paperwork have time and a dollar value, even if the price is part of a bigger line.
- Look at exclusions last. If a client reading it would be surprised by any line, say it on the phone before the quote goes out.
After the quote goes out
Ring to say the quote is on its way, then follow up the next day. The steps are in the follow-up email after a quote. If the quote goes quiet, why builder quotes go quiet covers the usual reasons. For getting enquiries in the first place, see electrician marketing. If you want someone else to follow up your quotes, that is the quotes page. PreBuild Systems does not currently list electrical among its trades.
Common questions
What should an electrical quote include?
Your licence number and ABN, the site, a scope by circuit or point, the switchboard work, who supplies fixtures, the compliance certificate, exclusions such as patching, the price, timing, payment and how long the price holds.
Is an electrical quote the same as an estimate?
No. A quote is a price for a defined scope. An estimate is a best guess that can move. State which one you are giving, at the top of the page.
Do I have to give the customer a compliance certificate?
In the states covered above, yes, and the certificate has a name and timing set by that state. Check your own regulator for the rules where you work.
Should I quote electrical work fixed price or by the hour?
Use fixed price when you can see and count the work. Use hourly with a cap for fault finding or work behind finished walls, and say which part is which.
Should patching and painting be in an electrical quote?
Write who does it. If you leave it out, say so as an exclusion. If you include it, name what you will repair and to what standard.
